History

1989

Back to previous

Back to previous >

Outline planning permission obtained for a hollowcore factory on the second piece of land but after further research it was concluded that the production capacity of the existing building could be modified to incorporate hollowcore production without the lead time and cost implications of a new factory.

Subscribe to our mailing list

* indicates required